oj mrJudge
Toggle navigation
  • Login
    • Forget Password
      Login
User Image

Hello, Stranger

Guest
  • Analysis Mode
  • Problems
    • All Problems
    • Latest Problems
  • Join Us Now
  • Registration
  • Contact Us
  • Infomation
  • About
    • Terms of Use
    • Technical Specifications
    • Credits

hopscotch Batch , stdin/stdout

Registered Users Only

Please login to utilize this feature.

Do note that this website only supports submissions in C++.

hopscotch.html

Every year the cows hold an event featuring a peculiar version of hopscotch that involves carefully jumping from rock to rock in a river. The excitement takes place on a long, straight river with a rock at the start and another rock at the end, L units away from the start (1 ≤ L ≤ 1,000,000,000). Along the river between the starting and ending rocks, N (0 ≤ N ≤ 50,000) more rocks appear, each at an integral distance Di from the start (0 < Di < L).

To play the game, each cow in turn starts at the starting rock and tries to reach the finish at the ending rock, jumping only from rock to rock. Of course, less agile cows never make it to the final rock, ending up instead in the river.

Farmer John is proud of his cows and watches this event each year. But as time goes by, he tires of watching the timid cows of the other farmers limp across the short distances between rocks placed too closely together. He plans to remove several rocks in order to increase the shortest distance a cow will have to jump to reach the end. He knows he cannot remove the starting and ending rocks, but he calculates that he has enough resources to remove up to M rocks (0 ≤ M ≤ N).

FJ wants to know exactly how much he can increase the shortest distance *before* he starts removing the rocks. Help Farmer John determine the greatest possible shortest distance a cow has to jump after removing the optimal set of M rocks.

Input

Line 1: Three space-separated integers: L, N, and M

Lines 2..N+1: Each line contains a single integer indicating how far some rock is away from the starting rock. No two rocks share the same position.

Output

Line 1: A single integer that is the maximum of the shortest distance a cow has to jump after removing M rocks

Sample Input 1

25 5 2
2
14
11
21
17

Sample Output 1

4

Explanation for Sample Output 1

Before removing any rocks, the shortest jump was a jump of 2 from 0 (the start) to 2. After removing the rocks at 2 and 14, the shortest required jump is a jump of 4 (from 17 to 21 or from 21 to 25).

Tags

Divide and Conquer

Subtasks and Limits

Subtask Score #TC Time Memory Scoring
1100101s19MBAverage
2011s19MBAverage

Judge Compile Command

g++-8 ans.cpp -o hopscotch -Wall -Wshadow -static -O2 -lm -m64 -s -w -std=gnu++17 -fmax-errors=512

Accepted Submissions

subIDUserTimeMax Time

Past Submissions

subIDUserTimeScore
mrJudge 09.05.20
Copyright © 2020 mrJudge. All rights reserved.